Print Report | Back to Sample Detail

Sample Record for 2016-09-09-11

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 210859 DEA: 010B3104 EFIS: 0112000115 QA Service Level: 1
DIST-CO-RTE-PM: 01-DN-199-8.7,21.7
Work Description: CONSTRUCT BUTTRESSES
Location Description: IN DEL NORTE COUNTY NEAR GASQUET AT1.6 MILES NORTH OF MYRTLE CREEK BRIDGE AND ABOUT 8 MILES NORTH OF GASQUET AT 0.4 MILE SOUTH OF PATRICK CREEK BRIDGE
Contractor Name: Flatiron Construction Inc.
Contractor Address: 1770 LA COSTA MEADOWS DRIVE, San Marcos, CA 92078
Resident Engineer: Karen Sanders Structure Rep.: Gary Woodard

Sample Information

DIME Sample ID: 2016-09-09-11
TL Number from the TL Form: NA
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 09/09/2016
Date that the sample was received by the laboratory/organization performing the testing: 11/17/2016
The quantity of what the sample constitutes: 8
A brief description of the sample: Barlock couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: NA

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Cascade
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 5 & 6
Coupler Model: Barlock
Coating Standards: ASTM A934
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 5L-127220, 6L-133375
Rebar Heat Number(s): 212416, 167616
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 6

DIME Test ID: 2016-09-09-11-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 11/17/2016
Date Tested: 11/17/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11#5/16mm0.31-0.00192890693245Service SpliceFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 2 of 6

DIME Test ID: 2016-09-09-11-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 11/17/2016
Date Tested: 11/17/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
21#5/16mm0.3102971195842Service SpliceFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 3 of 6

DIME Test ID: 2016-09-09-11-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 11/17/2016
Date Tested: 11/17/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
31#5/16mm0.3102960695503Service SpliceFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 4 of 6

DIME Test ID: 2016-09-09-11-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 11/17/2016
Date Tested: 11/17/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12#6/19mm0.44-0.00234146794243Service SpliceFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 5 of 6

DIME Test ID: 2016-09-09-11-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 11/17/2016
Date Tested: 11/17/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
22#6/19mm0.4404256696741Service SpliceFred
Temperature 72 F
UTM 400KIP
Halo ID Small

Test 6 of 6

DIME Test ID: 2016-09-09-11-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 11/17/2016
Date Tested: 11/17/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
32#6/19mm0.4404259496805Service SpliceFred
Temperature 72 F
UTM 400KIP
Halo ID Small