Print Report | Back to Sample Detail

Sample Record for 2021-10-19-21

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215587 DEA: 081L6804 EFIS: 0820000138 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-91,15-7.5/13.4,8.2/23.9
Work Description: SLAB REPLACEMENT, PLACE SLURRY SEAL AND REPLACE AC SURFACING.
Location Description: RIVERSIDE COUNTY IN AND NEAR CORONA AND MURRIETA ON ROUTE 91 FROM ROUTE 15/91 SEPARATION TO 0.4 MILE EAST OF TYLER STREET AND ON ROUTE 15 FROM 1.5 MILES NORTH OF WINCHESTER ROAD TO NICHOLS ROAD
Contractor Name: RV Concrete
Contractor Address: 605 E Commercial Street, Anaheim, CA 92801
Resident Engineer: Denise Sostrom Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-10-19-21
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Field Testing Laboratory
Sample Organization Contact: (951) 840-8328
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 10/19/2021
Date that the sample was received by the laboratory/organization performing the testing: 10/20/2021
The quantity of what the sample constitutes: 3 beams
A brief description of the sample: Concrete beams
From where was the sample collected: Job Site
Laboratory sample identification: 5RA,5RB,5RC
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: SHORTLOAD CONCRETE INC

Material Information

The concrete mix design number: CTS 65-EHI
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: TT
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: concrete sample from wheel barrow
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 3

DIME Test ID: 2021-10-19-21-1
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Verified Date: 10/26/2021
Date Tested: 10/22/2021
Submitted By Organization: CT D08 - Fontana Field Testing Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: kaushalkumar.talati@dot.ca.gov
Organization Phone: (951) 840-8328
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Number of specimens 1
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Fracture occurred at a capped section No
Is a beam dimensional correction factor used? No
Age of specimen 3 days
Modulus of rupture 750 psi

Test 2 of 3

DIME Test ID: 2021-10-19-21-2
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Verified Date: 10/26/2021
Date Tested: 10/22/2021
Submitted By Organization: CT D08 - Fontana Field Testing Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: kaushalkumar.talati@dot.ca.gov
Organization Phone: (951) 840-8328
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Number of specimens 1
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Fracture occurred at a capped section No
Is a beam dimensional correction factor used? No
Age of specimen 3 days
Modulus of rupture 780 psi

Test 3 of 3

DIME Test ID: 2021-10-19-21-3
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Verified Date: 10/26/2021
Date Tested: 10/22/2021
Submitted By Organization: CT D08 - Fontana Field Testing Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: kaushalkumar.talati@dot.ca.gov
Organization Phone: (951) 840-8328
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Number of specimens 1
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Fracture occurred at a capped section No
Is a beam dimensional correction factor used? No
Age of specimen 3 days
Modulus of rupture 830 psi