Project Information

Project ID: 214572 DEA: 034E62U4 EFIS: 0319000068 QA Service Level: 1
DIST-CO-RTE-PM: 03-ED-50-18.5/24.2
Work Description: CONSTRUCT UC, MED BARRIER, DRAINAGE SYSTEMS & HMA OVERLAY.
Location Description: EL DORADO COUNTY IN AND NEAR PLACERVILLE FROM MOSQUITO ROAD UNDERCROSSING TO SCHNELL SCHOOL ROAD UNDERCROSSING AND FROM 0.2 MILE WEST OF STILL MEADOW ROAD TO 0.2 MILE EAST OF CARSON ROAD
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 Townsgate Road, Suite 200, Westlake Village, CA 91361
Resident Engineer: Nathan Alterton Structure Rep.: Raymand Macy

Sample Information

DIME Sample ID: 2021-09-18-10
TL Number from the TL Form: C788802
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 09/18/2021
Date that the sample was received by the laboratory/organization performing the testing: 09/27/2021
The quantity of what the sample constitutes: 2 Lots of Couplers
A brief description of the sample: #6 HRC 500/510 Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator:
Rebar Size: #6
Coupler Model: HRC 500/510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): NC13204490 034766
Rebar Heat Number(s): 6024766
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 6

DIME Test ID: 2021-09-18-10-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/28/2021
Date Tested: 09/27/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 6/19mm1-0.00020.444325898315OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 6

DIME Test ID: 2021-09-18-10-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/28/2021
Date Tested: 09/27/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 6/19mm100.444226096046OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 6

DIME Test ID: 2021-09-18-10-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/28/2021
Date Tested: 09/27/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 6/19mm100.444314098045OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID

Test 4 of 6

DIME Test ID: 2021-09-18-10-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/28/2021
Date Tested: 09/27/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 6/19mm2-0.00110.444307697900OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 5 of 6

DIME Test ID: 2021-09-18-10-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/28/2021
Date Tested: 09/27/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 6/19mm200.444317798130OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID

Test 6 of 6

DIME Test ID: 2021-09-18-10-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/28/2021
Date Tested: 09/27/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 6/19mm200.444325998317OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID