Print Report | Back to Test Summary

Testing Report for 2021-09-02-28-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 030H10U4
EFIS: 0317000246
Project ID: 213411
QA Service Level: 1
DIST-CO-RTE-PM: 03-SAC-5-9.7/24.9
Work Description:
Location Description: Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Girmay Beyene
Structure Rep.: Luis Guzman

Sample Information

DIME Sample ID: 2021-09-02-28
TL Number from the TL Form: c799126
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 9/2/2021
Date that the sample was received by the laboratory/organization performing the testing: 9/7/2021
The quantity of what the sample constitutes: 2 Cans
A brief description of the sample: PG 64-16
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Pacific Northwest Oil

Material Information

Performance Grade: PG 64-16
Modified: No
Lot number: 6
Sublot number: 15
Tank number:
Time of sample:
HMA Supplier: Teichert Perkins
Asphalt Binder Supplier: Pacific Northwest Oil - Stockton CA
Multigrade: No
Multigrade Type:

Test Information

DIME Test ID: 2021-09-02-28-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Date Tested: 9/15/2021
Verified Date: 9/24/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: as per 2018 standard specs
Test Result Compliance: complies
Additional Comments When Verified :

Submitted Test Results

Is mass change based on one or two containers?: Two
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 166.304 grams
Mass of empty container #2: 168.906 grams
Mass of container #1 before test (m1i): 201.860 grams
Mass of container #2 before test (m2i): 205.185 grams
Mass of container #1 after test (m1f): 201.614 grams
Mass of container #2 after test (m2f): 204.951 grams
Average mass change: -0.668 percent