Print Report | Back to Test Summary

Testing Report for 2021-07-21-56-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: ASCP
EFIS: ASCP
Project ID: 44444
QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for Asphalt Supplier Certification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown
Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-07-21-56
TL Number from the TL Form:
Sample Submitted By Organization: Marathon Petroleum
Sample Organization Contact: (661) 392-3630
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 7/21/2021
Date that the sample was received by the laboratory/organization performing the testing: 7/21/2021
The quantity of what the sample constitutes: 1 of 1
A brief description of the sample: 8
From where was the sample collected: Manufacturer
Laboratory sample identification: 072121-8
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Mojave,CA

Material Information

Performance Grade: PG 64-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Asphalt Binder Supplier: Marathon Petroleum
Multigrade:
Multigrade Type:

Test Information

DIME Test ID: 2021-07-21-56-5
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Date Tested: 9/8/2021
Verified Date: 9/8/2021
Submitted By Organization: Marathon Petroleum
Organization Address: 1201 China Grade Loop,
Organization City: Bakersfield
Organization State: CA
Organization Zipcode: 93308
Organization Email: gdiaz@marathonpetroleum.com
Organization Phone: (661) 392-3630
General Comments for this Test: Submitted from ASCP bulk upload.
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Average mass change: -0.116 percent