Print Report | Back to Test Summary

Testing Report for 2021-08-15-7-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 060U4504
EFIS: 0615000298
Project ID: 214919
QA Service Level: 1
DIST-CO-RTE-PM: 06-FRE-168-18.6/T25.5
Work Description: COLD PLANE AC PAVEMENT AND HOT MIX ASPHALT RESURFACING.
Location Description: FRESNO COUNTY NEAR PRATHER FROM 0.1 MILE EAST OF SAMPLE ROAD TO OAK CREEK ROAD
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Mark Mengoni
Structure Rep.: Raman Guraya

Sample Information

DIME Sample ID: 2021-08-15-7
TL Number from the TL Form: 040676
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 8/15/2021
Date that the sample was received by the laboratory/organization performing the testing: 8/20/2021
The quantity of what the sample constitutes: 1 can
A brief description of the sample: PG 64-16
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMI Fresno

Material Information

Performance Grade: PG 64-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Asphalt Binder Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:

Test Information

DIME Test ID: 2021-08-15-7-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Date Tested: 8/23/2021
Verified Date: 8/30/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications
Test Result Compliance: complies
Additional Comments When Verified :

Submitted Test Results

Is mass change based on one or two containers?: Two
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 172.814 grams
Mass of empty container #2: 156.598 grams
Mass of container #1 before test (m1i): 207.966 grams
Mass of container #2 before test (m2i): 191.640 grams
Mass of container #1 after test (m1f): 207.978 grams
Mass of container #2 after test (m2f): 191.652 grams
Average mass change: 0.034 percent