Print Report | Back to Test Summary

Testing Report for 2021-08-13-21-3

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 074W6104
EFIS: 0719000104
Project ID: 215687
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-18-0.0/4.5
Work Description: PLACE RUBBERIZED HMA (GAP GRADED).
Location Description: LOS ANGELES COUNTY NEAR LLANO FROM SAN BERNARDINO COUNTY LINE TO JUNCTION ROUTE 138
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Fred Tieu
Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-08-13-21
TL Number from the TL Form:
Sample Submitted By Organization: CT - Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 8/13/2021
Date that the sample was received by the laboratory/organization performing the testing: 8/19/2021
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0483-21
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite-Big Rock

Material Information

Performance Grade: PG 64-16
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Asphalt Binder Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:

Test Information

DIME Test ID: 2021-08-13-21-3
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Date Tested: 8/20/2021
Verified Date: 8/20/2021
Submitted By Organization: CT - Southern Regional Laboratory
Organization Address: 13970 Victoria St,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified :

Submitted Test Results

Phase: Original binder
Test Plate Diameter: 25 mm
Phase Angle (δ) (for the 10 cycles): 89.1 degree
Dynamic Shear, G*/sin(δ): 1.45 kPa