Print Report | Back to Sample Detail

Sample Record for 2021-08-03-8

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-10-0.0/13.2
Work Description: Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location Description: LA/SBD County Line to PM 13.2 near I-15
Contractor Name: Lane-Security Paving Joint Venture
Contractor Address: 3450 Centre Lake Drive, 1st Floor, Ontario, CA 91761
Resident Engineer: Jose Corona Structure Rep.: Luis Negrete

Sample Information

DIME Sample ID: 2021-08-03-8
TL Number from the TL Form:
Sample Submitted By Organization: G3 Quality, Incorporated - Cerritos
Sample Organization Contact: (562) 321-9840
Type of Sample: Per Request
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 08/03/2021
Date that the sample was received by the laboratory/organization performing the testing: 08/17/2021
The quantity of what the sample constitutes: 90
A brief description of the sample: #6 Lenton Coupler
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name: Sultana Bridge OC
The fabricator/manufacturer/facility name: CMC Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: Lenton
Intermediate Assembler or Fabricator:
Rebar Size: #6
Coupler Model: Lenton S2
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): MM18108717
Rebar Heat Number(s): 4109255
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 4

DIME Test ID: 2021-08-03-8-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2021
Date Tested: 08/18/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 6/19mm1-0.00450.442500656833service splicespaine
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 4

DIME Test ID: 2021-08-03-8-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2021
Date Tested: 08/18/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 6/19mm100.443361176390service splicespaine
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 4

DIME Test ID: 2021-08-03-8-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2021
Date Tested: 08/18/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 6/19mm100.443279174525service splicespaine
UTM 400kip
Temperature 72.00 f
Halo ID

Test 4 of 4

DIME Test ID: 2021-08-03-8-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2021
Date Tested: 08/18/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
4No. 6/19mm100.443691683901service splicespaine
UTM 400kip
Temperature 72.00 f
Halo ID