Print Report | Back to Test Summary

Testing Report for 2021-08-03-33-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 09383504
EFIS: 0920000044
Project ID: 215536
QA Service Level: 1
DIST-CO-RTE-PM: 09-MNO-395-R40.1/R44.8
Work Description: PLACE HMA OVER EXISTING PAVEMENT.
Location Description: MONO COUNTY ABOUT 7 MILES SOUTH OF LEE VINING FROM 0.2 MILE SOUTH OF ROUTE 158 TO 0.6 MILE NORTH OF LA AQUEDUCT BRIDGE
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: P.E. RICK MOBERLY
Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-08-03-33
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 8/3/2021
Date that the sample was received by the laboratory/organization performing the testing: 8/13/2021
The quantity of what the sample constitutes: 1 can
A brief description of the sample: PG58-34M
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite

Material Information

Performance Grade: PG 58-34 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Asphalt Binder Supplier: PNAC LLC - Fernley NV
Multigrade: No
Multigrade Type:

Test Information

DIME Test ID: 2021-08-03-33-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Date Tested: 8/16/2021
Verified Date: 8/25/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications
Test Result Compliance: complies
Additional Comments When Verified :

Submitted Test Results

Is mass change based on one or two containers?: Two
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 166.547 grams
Mass of empty container #2: 175.891 grams
Mass of container #1 before test (m1i): 201.539 grams
Mass of container #2 before test (m2i): 210.774 grams
Mass of container #1 after test (m1f): 201.427 grams
Mass of container #2 after test (m2f): 210.664 grams
Average mass change: -0.318 percent