Sample Record for 2021-08-06-19
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213750 DEA: 120K0224 EFIS: 1214000097
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-5-14.5/17.1
Work Description: South County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS.
Location Description: ORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING
Contractor Name: Flatiron West, Inc
Contractor Address: 1770 La Costa Meadows Drive, San Marcos, California 92078
Resident Engineer: Steven Kim Structure Rep.: Sara Soleimani
Sample Information
DIME Sample ID: 2021-08-06-19
TL Number from the TL Form: C809403
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 08/06/2021
Date that the sample was received by the laboratory/organization performing the testing: 08/12/2021
The quantity of what the sample constitutes: 50 Couplers
A brief description of the sample: #11 Zap Screwlok Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Flatiron
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Vinton Steel
Coupler Manufacturer: BarSplice
Intermediate Assembler or Fabricator:
Rebar Size: #11
Coupler Model: Zap Screwlok Type 2
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): MM20106092
Rebar Heat Number(s): 21R0414
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 3
DIME Test ID: 2021-08-06-19-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/13/2021
Date Tested: 08/13/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 11/36mm | 1 | -0.0025 | 1.56 | 149693 | 95957 | Service Splice | fsaylor |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Large
|
Test 2 of 3
DIME Test ID: 2021-08-06-19-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/13/2021
Date Tested: 08/13/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 11/36mm | 1 | 0 | 1.56 | 149093 | 95573 | Service Splice | fsaylor |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 3
DIME Test ID: 2021-08-06-19-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/13/2021
Date Tested: 08/13/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 11/36mm | 1 | 0 | 1.56 | 150141 | 96244 | Service Splice | fsaylor |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|