Print Report | Back to Test Summary

Testing Report for 2021-07-14-22-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 030A5704
EFIS: 0300020593
Project ID: 214426
QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB-20-13.3/R18.2
Work Description: Browns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK.
Location Description: YUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Garrett Griffith
Structure Rep.: Matt Crete

Sample Information

DIME Sample ID: 2021-07-14-22
TL Number from the TL Form: 597105
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 7/14/2021
Date that the sample was received by the laboratory/organization performing the testing: 7/26/2021
The quantity of what the sample constitutes: 1 Can
A brief description of the sample: PG 64-16 Marathon
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Teichert - Hallwood Plant

Material Information

Performance Grade: PG 64-16
Modified:
Lot number: 6
Sublot number: 8
Tank number:
Time of sample:
HMA Supplier:
Asphalt Binder Supplier: Marathon Petroleum Co. LP - Elk Grove CA
Multigrade: No
Multigrade Type:

Test Information

DIME Test ID: 2021-07-14-22-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Date Tested: 8/1/2021
Verified Date: 8/4/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications
Test Result Compliance: complies
Additional Comments When Verified :

Submitted Test Results

Is mass change based on one or two containers?: Two
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 156.015 grams
Mass of empty container #2: 171.225 grams
Mass of container #1 before test (m1i): 192.077 grams
Mass of container #2 before test (m2i): 207.071 grams
Mass of container #1 after test (m1f): 191.928 grams
Mass of container #2 after test (m2f): 206.963 grams
Average mass change: -0.357 percent