Print Report | Back to Sample Detail

Sample Record for 2021-07-15-2

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 QA Service Level: 1
DIST-CO-RTE-PM: 03-SAC-99-7.92 / 8.4
Work Description: Remove and replace Consumnes River and Consumnes River Overflow bridge
Location Description: Sacramento County
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 4001 Bradshaw Road, Sacramento, CA 95827
Resident Engineer: Masoud Saed Structure Rep.: Chau Ha

Sample Information

DIME Sample ID: 2021-07-15-2
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 07/15/2021
Date that the sample was received by the laboratory/organization performing the testing: 07/15/2021
The quantity of what the sample constitutes: 150 Couplers
A brief description of the sample: #14 HRC 500/510 Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator:
Rebar Size: #14
Coupler Model: HRC 500/510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 73118000 74121241 74118343
Rebar Heat Number(s): 3101020
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 3

DIME Test ID: 2021-07-15-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/19/2021
Date Tested: 07/16/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 14/43mm1-0.00772.2521843197080Ok Neckingbewing
UTM 2000kip
Temperature 72.00 f
Halo ID Large

Test 2 of 3

DIME Test ID: 2021-07-15-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/19/2021
Date Tested: 07/16/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 14/43mm102.2521602696012Ok Neckingbewing
UTM 2000kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2021-07-15-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/19/2021
Date Tested: 07/16/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Ncking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 14/43mm102.2521836697052Ok Nckingbewing
UTM 2000kip
Temperature 72.00 f
Halo ID