Print Report | Back to Test Summary

Testing Report for 2021-07-06-23-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 060Q9104
EFIS: 0614000005
Project ID: 215075
QA Service Level: 1
DIST-CO-RTE-PM: 06-TUL-99-19.2/19.8
Work Description: BRIDGE DECK AND OUTSIDE GIRDER REPLACEMENT.
Location Description: TULARE COUNTY NEAR TIPTON FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF AVENUE 152 OVERCROSSING
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Javier Huerta
Structure Rep.: Peter Moua

Sample Information

DIME Sample ID: 2021-07-06-23
TL Number from the TL Form: 056233
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 7/6/2021
Date that the sample was received by the laboratory/organization performing the testing: 7/8/2021
The quantity of what the sample constitutes: 1 of 1 cans
A brief description of the sample: PG70-10
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: San Joaquin Refinery

Material Information

Performance Grade: PG 64-16
Modified: No
Lot number: 1
Sublot number: 1
Tank number:
Time of sample:
HMA Supplier: Jaxon - Deer Creek
Asphalt Binder Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:

Test Information

DIME Test ID: 2021-07-06-23-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Date Tested: 7/12/2021
Verified Date: 7/13/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 standard specifications
Test Result Compliance: complies
Additional Comments When Verified :

Submitted Test Results

Is mass change based on one or two containers?: Two
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 174.393 grams
Mass of empty container #2: 171.629 grams
Mass of container #1 before test (m1i): 209.545 grams
Mass of container #2 before test (m2i): 207.424 grams
Mass of container #1 after test (m1f): 209.460 grams
Mass of container #2 after test (m2f): 207.341 grams
Average mass change: -0.237 percent