Print Report | Back to Sample Detail

Sample Record for 2021-05-27-37

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 213749 DEA: 120C1104 EFIS: 1200000633 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-57-20.3/21.6
Work Description: SR-57 Lambert Interchange Project: WIDEN BRIDGES AND CONSTRUCT RW, SW, HMA, JPCP AND ELECTRICAL SYSTEMS.
Location Description: ORANGE COUNTY IN BREA FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: Steven Kim Structure Rep.: Theodore Pham

Sample Information

DIME Sample ID: 2021-05-27-37
TL Number from the TL Form: C378331
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 05/27/2021
Date that the sample was received by the laboratory/organization performing the testing: 06/17/2021
The quantity of what the sample constitutes: 4
A brief description of the sample: HRC 500 510 Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HRC CMC Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: HRC CMC Rebar
Intermediate Assembler or Fabricator:
Rebar Size: #11
Coupler Model: HRC 500-510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 73120296 74119266
Rebar Heat Number(s): 3100623 4106131
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 3

DIME Test ID: 2021-05-27-37-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/18/2021
Date Tested: 06/17/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 11/36mm10.00151.5614587993512OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 3

DIME Test ID: 2021-05-27-37-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/18/2021
Date Tested: 06/17/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 11/36mm101.5614510393015OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2021-05-27-37-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/18/2021
Date Tested: 06/17/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 11/36mm101.5614718494348OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID