Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 209453 DEA: 080J8504 EFIS: 0800000324
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-138-R24.1
Work Description: REPLACE EXISTING BRIDGE.
Location Description: SAN BERNARDINO COUNTY IN AND NEAR HESPERIA AT HORSETHIEF CREEK BRDIGE
Contractor Name: Steve P Rados Inc
Contractor Address: 2002 E McFadden Ave, Santa Ana, CA 92705
Resident Engineer: Amgad Benjamin Structure Rep.: Osama Abdalla
DIME Sample ID: 2015-05-22-3
TL Number from the TL Form: 15222
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 05/22/2015
Date that the sample was received by the laboratory/organization performing the testing: 05/27/2015
The quantity of what the sample constitutes: 6
A brief description of the sample: 6x12
From where was the sample collected: Job Site
Laboratory sample identification: 901-22
Structure unique identifier: HORSETHEIF CREEK BRIDGE 54 1271
Structure name: BENT 2 AND 3 AT SPLICE AREAS
The fabricator/manufacturer/facility name: JOB
The concrete mix design number: HG78547A
The truck number from where the sample was collected: 174
The batch plant ticket number from where the sample was collected: 822026
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: CHUTE
Where the material sample would have been placed if not sampled: Unknown
From Lot No.:
Bag Lot No.:
DIME Test ID: 2015-05-22-3-1
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 06/08/2015
Date Tested: 06/08/2015
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1
|
28.27 in^2
|
Cross sectional area of cylinder 2
|
28.27 in^2
|
Compressive strength (to nearest 10 psi)
|
4350 psi
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Age of specimen
|
17 days
|
DIME Test ID: 2015-05-22-3-2
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 06/15/2015
Date Tested: 06/15/2015
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross sectional area of cylinder 1
|
28.27 in^2
|
Cross sectional area of cylinder 2
|
28.27 in^2
|
Compressive strength (to nearest 10 psi)
|
4760 psi
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Age of specimen
|
24 days
|
DIME Test ID: 2015-05-22-3-3
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 07/13/2015
Date Tested: 07/13/2015
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Compressive strength of cylinder (to nearest 10 psi)
|
5630 psi
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Age of specimen
|
52 days
|
DIME Test ID: 2015-05-22-3-4
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 07/01/2015
Date Tested: 07/01/2015
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Compressive strength of cylinder (to nearest 10 psi)
|
5330 psi
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Age of specimen
|
40 days
|