Print Report | Back to Test Summary

Testing Report for 2020-12-11-4-4

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 010B0904
EFIS: 0100020444
Project ID: 214579
QA Service Level: 1
DIST-CO-RTE-PM: 01-DN-101-8.2/8.7
Work Description: BRIDGE REPLACEMENT
Location Description: DEL NORTE COUNTY NEAR KLAMATH AT PANTHER CREEK BRIDGE AND AT HUNTER CREEK BRIDGE
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Ryan Dunne
Structure Rep.: Bryan Keene

Sample Information

DIME Sample ID: 2020-12-11-4
TL Number from the TL Form:
Sample Submitted By Organization: CT QASI - Sacramento Field Laboratory
Sample Organization Contact: (916) 227-7263
Type of Sample: Acceptance
Type of Material: SMTL TM6 - Steel Check Sample Plate
Sample Taken Date: 12/11/2020
Date that the sample was received by the laboratory/organization performing the testing: 12/14/2020
The quantity of what the sample constitutes: 1
A brief description of the sample: 1 1/2" A709 Gr 50 plate
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Thompson Metal Fab

Material Information

Heat Number(s): 2504752
Material Specification: A709
Grade: 50
Thickness: 1.5
Shape: plate
Metal Foundry Manufacturer (Mill): Nucor
Plate Dimension: 96x480

Test Information

DIME Test ID: 2020-12-11-4-4
Test Method: ASTM E23-12c: Standard Test Methods for Notched Bar Impact Testing of Metallic Materials (Charpy Impact)
Date Tested: 1/13/2021
Verified Date: 1/27/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: (916) 227-7253
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Temperature Required: 40 oF
Minimum Energy Required: 25 ftlb
Test Temperature 1: 40 oF
Impact Energy 1: 49.34 ftlb
Impact Energy 2: 16.09 ftlb
Impact Energy 3: 54.28 ftlb
Average Impact Energy: 40 ftlb
Striker Radius: 8
Value Exceeds The Machine Capacity?: No