Project Information

DEA: 031E0604
EFIS: 0312000068
Project ID: 212914
QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB-70-15.5/16.5
Work Description: SIMMERLY SLOUGH BRIDGE REPLACEMENT BR 16-0019 WITH BR 16-0055.
Location Description: NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE BR 16-0019.
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Manoharan Selvendran
Structure Rep.: Travis Christie

Sample Information

DIME Sample ID: 2020-12-15-16
TL Number from the TL Form: C724304
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 12/15/2020
Date that the sample was received by the laboratory/organization performing the testing: 12/18/2020
The quantity of what the sample constitutes: 1 of 2
A brief description of the sample: PG Binder
From where was the sample collected: Other
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Teichert Hallwood

Material Information

Performance Grade: PG 64-16
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Asphalt Binder Supplier:
Multigrade:
Multigrade Type:

Test Information

DIME Test ID: 2020-12-15-16-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Date Tested: 12/23/2020
Verified Date: 12/30/2020
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: as per 2018 standard specs
Test Result Compliance: complies
Additional Comments When Verified :

Submitted Test Results

Is mass change based on one or two containers?: One
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.715 grams
Mass of container #1 before test (m1i): 210.254 grams
Mass of container #1 after test (m1f): 210.220 grams
Average mass change: -0.093 percent