Print Report | Back to Test Summary

Testing Report for 2020-12-07-11-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 050N73U4
EFIS: 0520000166
Project ID: 215129
QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-101-7.3/9.6
Work Description: Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, headed rebar, welded hoops, column pins.
Location Description: SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Tristan Gebhart
Structure Rep.: Bernardo Hernandez

Sample Information

DIME Sample ID: 2020-12-07-11
TL Number from the TL Form: C760213
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (916) 227-7253
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 12/7/2020
Date that the sample was received by the laboratory/organization performing the testing: 12/10/2020
The quantity of what the sample constitutes: 4
A brief description of the sample: Lenton form Savers couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Rebar Erico Lenton

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: Erico Lenton
Intermediate Assembler or Fabricator:
Rebar Size: #4
Coupler Model: Erico Lenton Form Savers
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator: CMC Rebar
Coupler Component Heat/Lot Number(s): L9720
Rebar Heat Number(s): 4102206 4102222
Rebar Size 2 :

Test Information

DIME Test ID: 2020-12-07-11-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Date Tested: 12/11/2020
Verified Date: 12/14/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: (916) 227-7253
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Number of Samples Tested: 1
Sample Number of Cycles Size Mfg. Lot Number(s) Slip (inch) Area (sqin) Peak Load (lbf) Peak Stress (psi) Comments Tested By
1 No. 4/13mm 1 -0.0013 0.2 18773 93864 Service Splice fsaylor
UTM: 400kip
Temperature: 72.00 f
Halo ID: Small