Print Report | Back to Test Summary

Testing Report for 2021-02-01-12-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 8801 DEA: AML-CEM EFIS: AML-CEM QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for Cementitious Materials for use in Concrete Authorized Material List (AML)
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-02-01-12
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Cement Testing Laboratory
Sample Organization Contact: (916) 227-7071
Type of Sample: Proficiency
Type of Material: Cementitious
Sample Taken Date: 02/01/2021
Date that the sample was received by the laboratory/organization performing the testing: 02/01/2021
The quantity of what the sample constitutes: 1 sample
A brief description of the sample: Portland Cement
From where was the sample collected: Manufacturer
Laboratory sample identification: CM218219
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CCRL Portland 219

Material Information

Brand: CCRL
Mill: CCRL
Type of Cementitious Material: Type II Cement

Test Information

DIME Test ID: 2021-02-01-12-1
Test Method: ASTM C109-16a: Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube Specimens)
Verified Date: 03/18/2021
Date Tested: 02/11/2021
Submitted By Organization: CT HQ - Sacramento Cement Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ben.lenz@dot.ca.gov
Organization Phone: (916) 227-7071
General Comments for this Test: 3 day test
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Specimen A Initial measurement at 24 hours 0.2563 in
Specimen B Initial measurement at 24 hours 0.315 in
Specimen C Initial measurement at 24 hours 0.258 in
Specimen D Initial measurement at 24 hours 0.2549 in
Specimen A Final measurement at 14 days 0.2567 in
Specimen B Final measurement at 14 days 0.3155 in
Specimen C Final measurement at 14 days 0.2585 in
Specimen D Final measurement at 14 days 0.2551 in
The average length of change of the four specimens 0.004 %