Sample Record for 2014-07-07-5732


Project Information

Project ID: 7780 DEA: 112T1824 EFIS: 1100020051 QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-805-4.7/5.6
Work Description: REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).
Location Description: SAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING
Contractor Name: GRANITE CONSTRUCTION COMPANY Contractor Address: 5860 El Camino Real #200
Resident Engineer: Tom Davis Structure Rep.: Ma, Anh

Sample Information

DIME Sample ID: 2014-07-07-5732
TL Number from the TL Form:
Sample Submitted By Organization: Vulcan Materials Company - San Diego
Sample Organization Contact: 619-572-9564
Type of Sample: Quality Control
Type of Material: Aggregate
Sample Taken Date: 07/07/2014
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 2 bags
A brief description of the sample: Portland Cement Concrete Aggregates
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:

Material Information

Source Identification (SMARA or name of Pit): 91-37-0035
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: conveyor belt
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size:
The concrete mix design number:
Lot number:
Sublot number:

Test Results

Test Information 4 of 4

DIME Test ID: 2014-07-07-5732-4
Test Method: AASHTO T11-5: Standard Method of Test for Materials Finer Than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing
Verified Date: 07/18/2014
Date Tested: 07/07/2014
Submitted By Organization: Vulcan Materials Company - San Diego
Organization Address: 10051 Black Mountain Road
Test General Comments:
Additional Comments When Verified:
Which test procedure is being used Method A
Percent of sample passing the #200 sieve (by mass) 1 %