Print Report | Back to Sample Detail

Sample Record for 2019-01-24-20

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 66667 DEA: JMFPP EFIS: 0019000043 QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-01-24-20
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 01/24/2019
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 1
A brief description of the sample: 3/4 Inch HMA-A
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Deer Creek Porterville

Material Information

RAP Source: Stockpile
Aggregate Size:
Aggregate Source:
RAP Stockpile:
Stockpile Size (tons):

Test Results

Test Information 1 of 2

DIME Test ID: 2019-01-24-20-1
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 04/10/2019
Date Tested: 01/24/2019
Submitted By Organization: CT HQ - Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: RAP Sample2A T-30
Additional Comments When Verified:
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 100 %
Cumulative percent passing the 3/8 in. sieve 99 %
Cumulative percent passing the 1/4 in. sieve 99 %
Cumulative percent passing the #4 sieve 74 %
Cumulative percent passing the #8 sieve 53 %
Cumulative percent passing the #16 sieve 38 %
Cumulative percent passing the #30 sieve 24 %
Cumulative percent passing the #50 sieve 16 %
Cumulative percent passing the #100 sieve 10 %
Cumulative percent passing the #200 sieve 7.4 %

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
No tests have been assigned to this sample.