Sample Record
Owner Lab
- CT HQ - FFS - Skid Testing
DIME Sample ID 2024-08-06-36
Project Information
Project Identifiers | Project ID: 1000079 DEA: 051Q1704 EFIS: 0522000178 |
---|---|
DIST-CO-RTE-PM | 05-MON,SLO-1,41,46,58,101-Var |
Award Date | 04/29/2024 |
Closeout Date | Not set |
Work Description | BRIDGE DECK REPAIRS, POLYESTER CONCRETE OVERLAYS, AND PLACING HMA. |
Location Description | MONTEREY AND SAN LUIS OBISPO COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 02/05/2024) |
Sample Information
Sample Taken Date | 08/06/2024 | Sample Unique Key | 36 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/06/2024 |
Sample type | Acceptance | A brief description of the sample | POLY |
The quantity of what the sample constitutes | POLY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | THAKUR |
Title of sampler | Telephone number of sampler | 9152961873 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | JOB SITE | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | Polyester Concrete |
---|---|---|---|
Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | |
Direction of Travel | Post Mile | ||
Lanes to be Tested | Station |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2024-08-06-36-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2024-08-06-36-2 CTM 342-August 2012 (Verified)