Sample Record
Owner Lab
- CT HQ - FFS - Skid Testing
DIME Sample ID 2024-06-11-16
Project Information
Project Identifiers | Project ID: 995083 DEA: 051R1604 EFIS: 0523000152 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-82.18, 82.2/82.2 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Repair high-load hit |
Location Description | Near Santa Maria, US101 and Clark Ave overcrossing. |
QA Service Level | 1 (Verified on 08/17/2023) |
Sample Information
Sample Taken Date | 06/11/2024 | Sample Unique Key | 16 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/11/2024 |
Sample type | Acceptance | A brief description of the sample | PCC |
The quantity of what the sample constitutes | BRIDGE DECK | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | THAKUR |
Title of sampler | Telephone number of sampler | 9152961873 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | job site | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
---|---|---|---|
Type of Traffic Control Provided | Moving Lane Closure | DIST-CO-RTE | |
Direction of Travel | Post Mile | ||
Lanes to be Tested | Station |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2024-06-11-16-1 CTM 342-August 2012 (Verified)