Sample Record

Owner Lab

  • CT D04 - San Jose Construction Field Laboratory

DIME Sample ID 2024-04-11-90

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Sample Information

Sample Taken Date04/11/2024 Sample Unique Key90
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/11/2024
Sample typeQuality Assurance A brief description of the sampleStructural Backfill Material
The quantity of what the sample constitutes2700g From where was the sample collectedJob Site
First name of sampler or witnessed byCharles Last name of sampler or witnessed byPoolis
Title of samplerCaltrans TET Telephone number of sampler
Laboratory sample identificationSJ-041124-SBF1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameMartin Marietta Sunol Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleMartin Marietta Sunol Plant
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedHWY 680 & 84 NB MSE Wall #5
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2024-04-11-90-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesFernando Vega, CT D04 - San Jose Construction Field Laboratory04/11/2024Charles Poolis
Yes
05/28/2024Sta. 506+50 to Sta. 510+50
2024-04-11-90-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesCharles Poolis, CT D04 - San Jose Construction Field Laboratory04/11/2024Charles Poolis
Yes
05/28/2024Sta. 506+50 to Sta. 510+50

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-04-11-90-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2024-04-11-90-2 CTM 216-June 2011 (Verified)