Sample Record
Owner Lab
- Con-Fab California, LLC
DIME Sample ID 2023-06-30-84
Project Information
Project Identifiers | Project ID: 993815 DEA: 081C0814 EFIS: 0816000086 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-R60.7/R74.3 |
Award Date | 03/28/2022 |
Closeout Date | Not set |
Work Description | I-10 PAVEMENT REHABILITATION (SEGMENT 1) PROJECT |
Location Description | Coachella |
QA Service Level | 1 (Verified on 05/03/2022) |
Sample Information
Sample Taken Date | 06/30/2023 | Sample Unique Key | 84 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/06/2023 |
Sample type | Quality Control | A brief description of the sample | T-II/V Cement |
The quantity of what the sample constitutes | 6.5 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Jesus | Last name of sampler or witnessed by | Rodriguez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | ConFab California, LLC Shafter | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | SCC_S8.5-0FG |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 3627 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Sampled from wheelbarrow collected from chute of ready mix truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2023-06-30-84-3 | ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete | Jesus Rodriguez , Con-Fab California, LLC | 06/30/2023 | Benjamin Aragon | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-06-30-84-3 ASTM C1611-21