Sample Record

Owner Lab

  • CT D06 - Millbrook Field Laboratory

DIME Sample ID 2024-04-03-24

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 995007
DEA: 061E7204
EFIS: 0622000092
DIST-CO-RTE-PM06-FRE-41-R27.0/R28.0
Award Date11/15/2023
Closeout DateNot set
Work DescriptionWROUGHT IRON FENCE AND CONSTRUCT SOUND WALL.
Location DescriptionFRESNO COUNTY IN FRESNO AT VARIOUS LOCATIONS FROM DAKOTA AVENUE OVERCROSSING TO GETTYSBURG AVENUE OVERCROSSING
QA Service Level1 (Verified on 07/27/2023)

Sample Information

Sample Taken Date04/03/2024 Sample Unique Key24
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/04/2024
Sample typeDepartment Acceptance A brief description of the sampleClass 1 1”/PG
The quantity of what the sample constitutes285 CY From where was the sample collectedJob Site
First name of sampler or witnessed byGerzon Last name of sampler or witnessed byCeja
Title of samplerASR Telephone number of sampler5599172487
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCALPORTLAND Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number172457
The truck number from where the sample was collected3123 The batch plant ticket number from where the sample was collected1355814
Concrete batch plantCALPORTLAND The fabricator/manufacturer designation for the sampleMix
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampledSoundwall footing
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2024-04-03-24-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTomas Silva, CT D06 - Millbrook Field Laboratory04/10/2024Tomas Silva
Yes
04/10/2024
2024-04-03-24-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTomas Silva, CT D06 - Millbrook Field Laboratory04/17/2024Tomas Silva
Yes
04/17/2024
2024-04-03-24-3CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTomas Silva, CT D06 - Millbrook Field Laboratory05/01/2024Tomas Silva
Yes
05/01/2024

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-04-03-24-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-04-03-24-2 CTM 521-June 2020 (Verified)
DIME Test ID: 2024-04-03-24-3 CTM 521-June 2020 (Verified)