Sample Record
Owner Lab
- CT HQ - FFS - Skid Testing
DIME Sample ID 2023-11-13-52
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 214261 DEA: 06484604 EFIS: 0600000484 COOP: 061726 |
---|---|
DIST-CO-RTE-PM | 06--,99- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | The bridge work includes construction of ten (10) new bridges as part of the future SR-58 Centennial Corridor. This work includes constructing one (1) Viaduct, four (4) Undercrossings, three (3) Overcrossings, and two (2) Connector Overcrossings. In addit |
Location Description | n Kern County in Bakersfield on Route 58 from 0.1 miles west of Mohawk St to Cottonwood Rd and on Route 99 from 0.8 miles south of Route 58 to 0.3 Miles north of Route 58 |
QA Service Level | 2 (Verified on 08/05/2019) |
Sample Information
Sample Taken Date | 11/13/2023 | Sample Unique Key | 52 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/13/2023 |
Sample type | Department Acceptance | A brief description of the sample | Skid Portable |
The quantity of what the sample constitutes | Skid Testing | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jessie | Last name of sampler or witnessed by | Wilson |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Job Site | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | South Real Road UC |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
---|---|---|---|
Type of Traffic Control Provided | N/A | DIST-CO-RTE | 06-Ker-58 |
Direction of Travel | East | Post Mile | |
Lanes to be Tested | Off Ramp | Station |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-11-13-52-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-11-13-52-2 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-11-13-52-3 CTM 342-August 2012 (Verified)