Sample Record

Owner Lab

  • CT - Southern Regional Laboratory

DIME Sample ID 2016-01-14-6

Project Information

Project IdentifiersProject ID: 210737
DEA: 073X7114
EFIS: 0715000132
DIST-CO-RTE-PM07-LA-60,126-R7.4/R8.1
Award Date11/16/2015
Closeout Date06/16/2021
Work DescriptionREALIGN RAMPS, WIDEN BRIDGE, AND REPLACE RAMPS PAVEMENT.
Location DescriptionIN LA COUNTY, IN CITY OF MONTEBELLOAT PARAMOUNT BOULEVARD OVERCROSSING
QA Service Level1 (Verified on 12/11/2015)

Sample Information

Sample Taken Date01/14/2016 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/29/2016
Sample typeAnnual Source Testing A brief description of the sampleOne and a half inch PCC Aggregates
The quantity of what the sample constitutes4 Bags From where was the sample collectedFabricator
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification6039B Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameUnited Rock Products Irwindale Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA or name of Pit)SMARA 91 19 0015
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedUnknown
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design number Lot numberNot set
Sublot numberNot set HMA Design ID

Submitted Tests

DIME Test IDTest MethodTester NameTesting LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2016-01-14-6-1CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse AggregatesNader RashidiCT - Southern Regional Laboratory02/08/2016Charles Mcdonald
No
Info
2016-01-14-6-3CTM 211-May 2010: Abrasion of Coarse Aggregate by Use of the Los Angeles Abrasion Testing MachineBabak RazaeiCT - Southern Regional Laboratory02/08/2016Charles Mcdonald
No
Info
2016-01-14-6-4CTM 227-June 2012: Method of Test for Evaluating Cleanness of Coarse Aggregate (Cleanness)MD ShahjahanCT - Southern Regional Laboratory02/09/2016Charles Mcdonald
No
Info
2016-01-14-6-5CTM 214-August 2010: Method of Test for Soundness of Aggregates by Use of Sodium SulfateNemencio DaofCT - Southern Regional Laboratory04/11/2016Charles Mcdonald
No
Info
2016-01-14-6-6CTM 206-October 2011: Method of Test for Specific Gravity and Absorption of Coarse AggregateFarzin FarahCT - Southern Regional Laboratory02/10/2016Charles Mcdonald
No
Info