Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2016-03-01-3
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 209217 DEA: 080F5404 EFIS: 0800000136 COOP: 081468 |
---|---|
DIST-CO-RTE-PM | 08-RIV-91,15-0.0/13.04, 35.64/45.14 |
Award Date | 09/09/2013 |
Closeout Date | 09/20/2023 |
Work Description | SR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas. |
Location Description | 08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14 |
QA Service Level | 1 (Verified on 08/07/2014) |
Sample Information
Sample Taken Date | 03/01/2016 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/03/2016 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | A | Last name of sampler or witnessed by | Nguyen |
Title of sampler | TET | Telephone number of sampler | Unknown |
Laboratory sample identification | 888-SRL145 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | HOLLIDAY ROCK | Transportation Laboratory (TL) Number | SRL-145 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Unknown |
Structure name | Unknown |
Material Information
Material Type | Concrete | The concrete mix design number | CM 5645 |
---|---|---|---|
The truck number from where the sample was collected | 370 | The batch plant ticket number from where the sample was collected | 118042220 |
Concrete batch plant | Unk | The fabricator/manufacturer designation for the sample | BATCH PLANT |
A detailed description of where the material sample was collected | BACK OF THE TRUCK LOAD 13 | Where the material sample would have been placed if not sampled | RW 212 B FTG |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2016-03-01-3-1 ASTM C39-17a (Verified)
DIME Test ID: 2016-03-01-3-2 ASTM C39-17a (Verified)
DIME Test ID: 2016-03-01-3-3 ASTM C39-17a (Verified)