Sample Record

Owner Lab

  • CT D06 - Bakersfield Field Laboratory

DIME Sample ID 2023-03-27-8

Project Information

Project IdentifiersProject ID: 993386
DEA: 060R1904
EFIS: 0614000057
COOP: 061783
DIST-CO-RTE-PM06-KER-184,223-L0.0/L0.3,R15.7/R16.3
Award Date01/25/2022
Closeout Date04/08/2024
Work DescriptionCONSTRUCT ROUNDABOUT, CURB RAMPS, AND LIGHTING SYSTEMS.
Location DescriptionKERN COUNTY NEAR ARVIN ON ROUTE 184 FROM ROUTE 223 TO 0.3 MILE NORTH OF ROUTE 223 AND ON ROUTE 223 FROM 0.3 MILE WEST OF ROUTE 184 TO 0.3 MILE EAST OF ROUTE 184
QA Service Level1 (Verified on 11/15/2021)

Sample Information

Sample Taken Date03/27/2023 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/27/2023
Sample typeDepartment Acceptance A brief description of the samplePortland Cement Concrete
The quantity of what the sample constitutesOne Wheel Barrel From where was the sample collectedJob Site
First name of sampler or witnessed byNeale Last name of sampler or witnessed byBrown
Title of samplerMaterials Tester Telephone number of sampler6615498281
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGolden Empire - Bakersfield Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberND15518C
The truck number from where the sample was collectedLoad 1 truck 9135 The batch plant ticket number from where the sample was collected207292571
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of the truck Load 1 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-03-27-8-1CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteNeale Brown, CT D06 - Bakersfield Field Laboratory03/27/2023Kulwinder Rai
Yes
03/27/2023Hwy 184/223 roundabout outer portion west slab
2023-03-27-8-2CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodNeale Brown, CT D06 - Bakersfield Field Laboratory03/27/2023Kulwinder Rai
Yes
03/27/2023
2023-03-27-8-3CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement ConcreteNeale Brown, CT D06 - Bakersfield Field Laboratory03/27/2023Kulwinder Rai
Yes
03/27/2023
2023-03-27-8-4CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement ConcreteNeale Brown, CT D06 - Bakersfield Field Laboratory03/27/2023Kulwinder Rai
Yes
03/27/2023
2023-03-27-8-5CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteNeale Brown, CT D06 - Bakersfield Field Laboratory04/06/2023Kulwinder Rai
Yes
04/06/2023Field curing Beam Per section 40 require 10 days and 550 psi for opening traffic
2023-03-27-8-6CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteJames Watson, CT D06 - Bakersfield Field Laboratory04/11/2023Kulwinder Rai
Yes
04/11/2023Field curing Beam
2023-03-27-8-7CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteJames Watson, CT D06 - Bakersfield Field Laboratory04/18/2023Kulwinder Rai
Yes
04/18/2023
2023-03-27-8-8CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteNeale Brown, CT D06 - Bakersfield Field Laboratory04/24/2023Kulwinder Rai
Yes
04/24/2023Standard curing Beam 28 day =570psi required per section 40

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-03-27-8-1 CTM 518-June 2010 (Verified)
File NameExtensionDate UploadedTest IDActions
06_0R1904_37042_230327_P1pdf03/27/20232023-03-27-8-1   Info

DIME Test ID: 2023-03-27-8-2 CTM 504-June 2010 (Verified)
DIME Test ID: 2023-03-27-8-3 CTM 533-June 2010 (Verified)
DIME Test ID: 2023-03-27-8-4 CTM 557-July 2012 (Verified)
DIME Test ID: 2023-03-27-8-5 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0R1904_37042_230406_10D_94pdf04/06/20232023-03-27-8-5   Info

DIME Test ID: 2023-03-27-8-6 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0R1904_37042_230406_15D_94pdf04/11/20232023-03-27-8-6   Info

DIME Test ID: 2023-03-27-8-7 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0R1904_37042_230406_21D_94pdf04/18/20232023-03-27-8-7   Info

DIME Test ID: 2023-03-27-8-8 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0R1904_37042_230406_28D_95pdf04/24/20232023-03-27-8-8   Info