Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2022-12-22-51

Project Information

Project IdentifiersProject ID: 215220
DEA: 07210624
EFIS: 0719000068
DIST-CO-RTE-PM07-LA,SBD-71-1.8/R4.7&R0.0/R0.2
Award Date02/05/2021
Closeout DateNot set
Work DescriptionPLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP.
Location DescriptionIN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE.
QA Service Level1 (Verified on 03/24/2021)

Sample Information

Sample Taken Date12/22/2022 Sample Unique Key51
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/23/2022
Sample typeAcceptance A brief description of the sample6X12 PCC cylinder
The quantity of what the sample constitutes130 CY From where was the sample collectedJob Site
First name of sampler or witnessed byNoura Last name of sampler or witnessed byAlayyan
Title of samplerAssistant Structure Representative Telephone number of sampler
Laboratory sample identification22-0377 Linked DIME Sample ID
The fabricator/manufacturer/facility nameROBERTSONS POMONA Transportation Laboratory (TL) Number07-210624-033
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberSSC590B38
The truck number from where the sample was collected6 The batch plant ticket number from where the sample was collected1726
Concrete batch plantRobertsons Pomona The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedtruck chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-12-22-51-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersArnold Truong, CT D07 - Materials Field Laboratory, Unit 195301/19/2023Robert Achuela
Yes
01/20/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-12-22-51-1 CTM 521-June 2020 (Verified)