Sample Record

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

DIME Sample ID 2015-07-15-4

Project Information

Project IdentifiersProject ID: 5266
DEA: 08448404
EFIS: 0800000712
COOP: 081488A1
DIST-CO-RTE-PM08-RIV-91-15.6/21.6
Award Date02/10/2012
Closeout Date07/27/2023
Work DescriptionCONSTRUCT HOV LANES AND WIDEN BRIDGES.
Location DescriptionRIVERSIDE COUNTY IN RIVERSIDE FROM ADAMS STREET TO THE ROUTE 60/215 SEPARATION
QA Service Level1 (Verified on 04/27/2012)

Sample Information

Sample Taken Date07/15/2015 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/20/2015
Sample typeQuality Control A brief description of the sample6X12
The quantity of what the sample constitutes2 From where was the sample collectedJob Site
First name of sampler or witnessed byHUNG Last name of sampler or witnessed byNGO
Title of samplerASR Telephone number of samplerUnknown
Laboratory sample identification889-15 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJOB Transportation Laboratory (TL) Number150715
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierCIDH PILEST AT RW26 CC047
Structure nameUnknown

Material Information

Material TypeConcrete The concrete mix design number1570340
The truck number from where the sample was collected7003 The batch plant ticket number from where the sample was collected25970596
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedSHUTE Where the material sample would have been placed if not sampledUnknown
From Lot No.Not set Bag Lot No.Not set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2015-07-15-4-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory08/12/2015Matthew Clayton
Yes
08/12/2015

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2015-07-15-4-1 CTM 521-November 2014 (Verified)