Sample Record
Owner Lab
- RMA Group - Rancho Cordova
DIME Sample ID 2022-10-25-26
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 215783 DEA: 033H3304 EFIS: 0317000325 |
---|---|
DIST-CO-RTE-PM | 03-YOL,SAC-50-2.5/3.2,L0.0/18.3 |
Award Date | 08/20/2021 |
Closeout Date | 01/22/2024 |
Work Description | INSTALL CMS, FIBER OPTIC CABLE SYSTEMS AND CAMERA SYSTEMS. |
Location Description | YOLO COUNTY AND SACRAMENTO COUNTY ON ROUTE 50 FROM JEFFERSON BOULEVARD TO 1.3 MILES EAST OF FOLSOM BOULEVARD |
QA Service Level | 1 (Verified on 07/26/2021) |
Sample Information
Sample Taken Date | 10/25/2022 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/25/2022 |
Sample type | Quality Control | A brief description of the sample | 1 x 4 PCC Aggregate |
The quantity of what the sample constitutes | 1 Day | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Nicole | Last name of sampler or witnessed by | Marcal |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Cemex | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-34-0060 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | No Information | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | CT590 | Lot number | |
Sublot number | Aggregate Mix Number |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-10-25-26-1 CTM 202-November 2011 (Verified)
DIME Test ID: 2022-10-25-26-2 CTM 227-December 2014 (Verified)