Sample Record

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

DIME Sample ID 2022-07-18-68

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993206
DEA: 101N4604
EFIS: 1021000191
DIST-CO-RTE-PM10-SJ-99-20.12, 20.12, 20.12/20.12
Award Date05/24/2021
Closeout Date11/27/2023
Work DescriptionEmergency Repair of Fire-damaged Stockton Diverting Canal Bridge
Location DescriptionNot set
QA Service Level1 (Verified on 09/08/2021)

Sample Information

Sample Taken Date07/18/2022 Sample Unique Key68
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/18/2022
Sample typeQuality Assurance A brief description of the sampleElephant Armor
The quantity of what the sample constitutes3 bags From where was the sample collectedManufacturer
First name of sampler or witnessed byDaniel Last name of sampler or witnessed byLaureno
Title of samplerSR Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGlobal Sealer Technologies Transportation Laboratory (TL) Number923841
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeRapid Set ManufacturerGlobal Sealer Technbologies
Mix no.3649 Materials Received7/18/22
Lot no.071222 Batch no.071222

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-07-18-68-1CONCLP 2-16: Rapid Set Patching MaterialsPhillip Montes, CT HQ - Sacramento Concrete Testing Laboratory09/09/2022Phillip Montes
Yes
09/13/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-07-18-68-1 CONCLP 2-16 (Verified)