Sample Record

Owner Lab

  • CT D05 - Big Sur Field Laboratory

DIME Sample ID 2022-08-03-29

Project Information

Project IdentifiersProject ID: 213598
DEA: 051F75U4
EFIS: 0518000092
DIST-CO-RTE-PM05-MON-101-R36.9/47.7
Award Date01/16/2019
Closeout Date01/11/2024
Work DescriptionCRCP, SEISMIC RETROFIT, BRIDGE WIDENING AND MEDIAN BARRIER
Location DescriptionMONTEREY COUNTY IN AND NEAR KING CITY FROM 0.4 MILE SOUTH OF WILD HORSE ROAD OVERCROSSING TO TEAGUE AVENUE
QA Service Level1 (Verified on 10/11/2018)

Sample Information

Sample Taken Date08/03/2022 Sample Unique Key29
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/03/2022
Sample typeQuality Assurance A brief description of the sampleNative Subgrade
The quantity of what the sample constitutes67 sy From where was the sample collectedJob Site
First name of sampler or witnessed byMathew Last name of sampler or witnessed bySpencer
Title of samplerTET Telephone number of sampler8057790845
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameJobsite native subgrade Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedNative Material
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-08-03-29-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesSalvador Zepeda, CT D05 - Big Sur Field Laboratory08/03/2022Salvador Zepeda
Yes
08/10/2022SB 101, Canal St On Ramp MVP R-21
2022-08-03-29-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesSalvador Zepeda, CT D05 - Big Sur Field Laboratory08/03/2022Salvador Zepeda
Yes
08/10/2022SB 101, Canal St On Ramp MVP2 R-21

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-08-03-29-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2022-08-03-29-2 CTM 216-June 2011 (Verified)