Sample Record

Owner Lab

  • CT D02 - Redding Northern Regional Laboratory

DIME Sample ID 2022-06-20-24

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993311
DEA: 022J4104
DIST-CO-RTE-PM02-TEH-36-L0.0/6.0
Award Date12/02/2021
Closeout Date08/25/2022
Work DescriptionPLACE HMA (TYPE A) OVERLAY.
Location DescriptionTEHAMA COUNTY NEAR PLATINA FROM BEEGUM CREEK BRIDGE TO 2.5 MILES EAST OF BALL ROAD
QA Service Level1 (Verified on 10/18/2021)

Sample Information

Sample Taken Date06/20/2022 Sample Unique Key24
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/20/2022
Sample typeAcceptance A brief description of the sample3 bags of Shoulder Backing
The quantity of what the sample constitutesShoulder Backing on Project From where was the sample collectedManufacturer
First name of sampler or witnessed byJosh Last name of sampler or witnessed byBratcher
Title of samplerJET Telephone number of sampler
Laboratory sample identificationD79056 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCedar Creek Agg Transportation Laboratory (TL) Number875982
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Cedar Creek Agg
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedUndefined
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-06-20-24-1CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse AggregatesKaren Rios Dorado, CT D02 - Redding Northern Regional Laboratory06/23/2022Ward Jenkins
Yes
06/24/2022
2022-06-20-24-2CTM 205-December 2010: Method of Test for Determining Percentage of Crushed ParticlesKaren Rios Dorado, CT D02 - Redding Northern Regional Laboratory06/24/2022Ward Jenkins
Yes
06/24/2022Percentage of particles with at least one fractured face. The percentage of fine crushed particles was not determined.
2022-06-20-24-3CTM 212-May 2010: Method of Test for Unit Weight of AggregateKaren Rios Dorado, CT D02 - Redding Northern Regional Laboratory06/22/2022Ward Jenkins
Yes
06/24/2022
2022-06-20-24-4CTM 217-June 2011: Method of Test for Sand EquivalentKaren Rios Dorado, CT D02 - Redding Northern Regional Laboratory06/24/2022Ward Jenkins
Yes
06/24/2022
2022-06-20-24-5CTM 229-June 2011: Method of Test for Durability IndexKaren Rios Dorado, CT D02 - Redding Northern Regional Laboratory06/24/2022Ward Jenkins
Yes
06/24/2022
2022-06-20-24-6CTM 205-December 2010: Method of Test for Determining Percentage of Crushed ParticlesKaren Rios Dorado, CT D02 - Redding Northern Regional Laboratory06/24/2022Ward Jenkins
Yes
06/24/2022Percentage of particles with at least two fractured faces. The percentage of fine crushed particles was not determined.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-06-20-24-1 CTM 202-November 2011 (Verified)
DIME Test ID: 2022-06-20-24-2 CTM 205-December 2010 (Verified)
DIME Test ID: 2022-06-20-24-3 CTM 212-May 2010 (Verified)
DIME Test ID: 2022-06-20-24-4 CTM 217-June 2011 (Verified)
DIME Test ID: 2022-06-20-24-5 CTM 229-June 2011 (Verified)
DIME Test ID: 2022-06-20-24-6 CTM 205-December 2010 (Verified)