Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2022-05-14-4

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award Date04/03/2020
Closeout Date06/06/2024
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date05/14/2022 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/14/2022
Sample typeDepartment Acceptance A brief description of the sampleAggregate Base
The quantity of what the sample constitutes2912.5 SF From where was the sample collectedJob Site
First name of sampler or witnessed byMichelangelo Last name of sampler or witnessed bySese
Title of samplerTET Telephone number of sampler310-345-6204
Laboratory sample identification22-1163 Linked DIME Sample ID
The fabricator/manufacturer/facility nameNA Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleAggregate Base
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedVarious locations
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-05-14-4-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesMichelangelo Sese, CT D07 - Materials Field Laboratory, Unit 195305/14/2022Michelangelo Sese
Yes
05/14/2022
2022-05-14-4-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesMichelangelo Sese, CT D07 - Materials Field Laboratory, Unit 195305/14/2022Michelangelo Sese
Yes
05/14/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-05-14-4-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2022-05-14-4-2 CTM 216-June 2011 (Verified)