Sample Record

Owner Lab

  • Kleinfelder, Incorporated - Los Angeles

DIME Sample ID 2022-02-27-9

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award Date04/03/2020
Closeout Date06/06/2024
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date02/27/2022 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/28/2022
Sample typeQuality Assurance A brief description of the sampleA set of 3 JPCP RSC beams
The quantity of what the sample constitutes565 CY From where was the sample collectedJob Site
First name of sampler or witnessed byIan Last name of sampler or witnessed bySnyder
Title of samplerField Materials Tester Telephone number of sampler5628339318
Laboratory sample identification22-0363 Linked DIME Sample ID
The fabricator/manufacturer/facility nameFlatiron Plant - Paxton off-Ramp Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number3215-JPCPRSC-12
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedLoad 15
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-02-27-9-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteIan Snyder, Kleinfelder, Incorporated - Los Angeles03/08/2022Jeff Diaz
Yes
03/11/2022WB 118 to EB 210 Connector Sta 348+20 to Sta 358+80. Opening age JPCP-RSC breaks @ 12.5 hours = 480 psi (average)

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-02-27-9-1 CTM 524-March 2013 (Verified)