Sample Record

Owner Lab

  • Sequoia Consultants

DIME Sample ID 2022-01-27-40

Project Information

Project IdentifiersProject ID: 214756
DEA: 050N7AU4
EFIS: 0520000030
DIST-CO-RTE-PM05-SB-101-1.4/4.8
Award DateNot set
Closeout Date09/27/2022
Work DescriptionSegment 4A - Carpinteria: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, epoxy coated rebar, precast box culverts, precast RCP.
Location DescriptionCARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE
QA Service Level1 (Verified on 03/09/2020)

Sample Information

Sample Taken Date01/27/2022 Sample Unique Key40
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/28/2022
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes100 cy From where was the sample collectedSource
First name of sampler or witnessed byRobert Last name of sampler or witnessed byMavis
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHanson Goleta Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameSound Wall 1 Pile Cap

Material Information

Material TypeConcrete The concrete mix design number63511N0P
The truck number from where the sample was collected552 The batch plant ticket number from where the sample was collected43613
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedCHUTE FROM TRUCK Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-01-27-40-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJulio Lugo, Sequoia Consultants02/24/2022Ruben Jimenez
Yes
02/25/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-01-27-40-1 CTM 521-June 2020 (Verified)