Sample Record
Owner Lab
- CT D03 - Olivehurst Northern Regional Laboratory
DIME Sample ID 2021-05-11-33
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 214426 DEA: 030A5704 EFIS: 0300020593 |
---|---|
DIST-CO-RTE-PM | 03-YUB-20-13.3/R18.2 |
Award Date | 01/02/2020 |
Closeout Date | Not set |
Work Description | Browns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK. |
Location Description | YUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE |
QA Service Level | 1 (Verified on 10/23/2019) |
Sample Information
Sample Taken Date | 05/11/2021 | Sample Unique Key | 33 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/12/2021 |
Sample type | Verification | A brief description of the sample | RAP 1/2" |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Kenny | Last name of sampler or witnessed by | McHugh |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Teichert Hallwood Drum Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Hallwood Drum Plant |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
JMF Information
Verification ID | JMF3513-2021-68 | Date Created | 08/10/2021 |
---|---|---|---|
JMF Submittal ID | JMF3511-23-2021-86 | JMF Status | Submittal Authorized For Use |
Producer Mix ID | 309-40442407-M | Authorized Date | 09/10/2021 |
Submitted Tests
DIME Test ID | Test Method | Tester Name | Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|---|
2021-05-11-33-1 | AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content) | Teichert Hallwood Personnel | CT D03 - Olivehurst Northern Regional Laboratory | 07/12/2021 | Julian Gonzales | Yes | 08/13/2021 | JMF 21-028 | |
2021-05-11-33-4 | AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis) | Mario Munoz | CT D03 - Olivehurst Northern Regional Laboratory | 07/13/2021 | Julian Gonzales | Yes | 08/13/2021 | JMF 21-028 | |
2021-05-11-33-5 | AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity) | Benjamin Dreher | CT D03 - Olivehurst Northern Regional Laboratory | 07/14/2021 | Julian Gonzales | No | JMF 21-028 | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-05-11-33-1 AASHTO T308-10 (Verified)
DIME Test ID: 2021-05-11-33-4 AASHTO T30-19 (Verified)
DIME Test ID: 2021-05-11-33-5 AASHTO T209-12