Sample Record
Owner Lab
- CT D07 - Materials Field Laboratory, Unit 1953
DIME Sample ID 2021-03-04-29
Project Information
Project Identifiers | Project ID: 210735 DEA: 071193U4 EFIS: 0713000007 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-37.2/42.4 |
Award Date | 11/16/2015 |
Closeout Date | 07/11/2022 |
Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
Location Description | IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
QA Service Level | 1 (Verified on 03/07/2016) |
Sample Information
Sample Taken Date | 03/04/2021 | Sample Unique Key | 29 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/05/2021 |
Sample type | Quality Assurance | A brief description of the sample | Native Material |
The quantity of what the sample constitutes | 12490 grams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Chad | Last name of sampler or witnessed by | Chotibhongs |
Title of sampler | MREA | Telephone number of sampler | (213)817-0387 |
Laboratory sample identification | 21-0716 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Collected at jobsite | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | I-10 EB to CA-57 Connector. East side of Kellog Drive Bridge. | |
Where the material sample would have been placed if not sampled |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2021-03-04-29-1 | CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages | Chad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 1953 | 03/05/2021 | Chad Chotibhongs | No | Info | ||
2021-03-04-29-2 | CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates | Chad Chotibhongs, CT D07 - Materials Field Laboratory, Unit 1953 | 03/05/2021 | Chad Chotibhongs | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-03-04-29-1 CTM 231-March 2013
DIME Test ID: 2021-03-04-29-2 CTM 216-June 2011