Sample Record
Owner Lab
- CT D02 - North Region Materials Lab
DIME Sample ID 2021-03-04-27
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 213700 DEA: 020H9004 EFIS: 0215000077 |
---|---|
DIST-CO-RTE-PM | 02-BUT-70-41.9/42.3 |
Award Date | 05/07/2020 |
Closeout Date | 11/01/2021 |
Work Description | REMOVE CULVERTS AND CONSTRUCT BRIDGE |
Location Description | BUTTE COUNTY NEAR PULGA FROM 2.5 MILES WEST OF PENSTOCK UNDERCROSSING TO 2.1 MILES WEST OF PENSTOCK UNDERCROSSING |
QA Service Level | 1 (Verified on 01/03/2019) |
Sample Information
Sample Taken Date | 03/04/2021 | Sample Unique Key | 27 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/05/2021 |
Sample type | Acceptance | A brief description of the sample | 1/2-inch RAP (Combined) |
The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Monte | Last name of sampler or witnessed by | Spencer |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | D78752B | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Knife River Construction - Orland Plant | Transportation Laboratory (TL) Number | 896989 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Orland Plant |
---|---|---|---|
Aggregate Size | 1/2-inch | Aggregate Source | |
RAP Stockpile | Stockpile Size (tons) | ||
HMA Design ID |