Sample Record
Owner Lab
- CT HQ - QASI Bay Area Field Office
DIME Sample ID 2020-08-03-4
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 212501 DEA: 022E4804 EFIS: 0200000586 |
---|---|
DIST-CO-RTE-PM | 02-SIS-96,263-103.1/103.6,56.8/57.2 |
Award Date | 12/14/2018 |
Closeout Date | 12/01/2021 |
Work Description | BRIDGE REPLACEMENT |
Location Description | SISKIYOU COUNTY ABOUT 8 MILES NORTH OF YREKA ON ROUTE 96 FROM 0.5 MILE WEST TO 0.2 MILE EAST OF ROUTE 263 AND ON ROUTE 263 FROM 0.3 MILE NORTH OF SHASTA RIVER BRIDGE #02-0014 TO ROUTE 96 |
QA Service Level | 1 (Verified on 06/06/2017) |
Sample Information
Sample Taken Date | 08/03/2020 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/06/2020 |
Sample type | Quality Assurance | A brief description of the sample | 1/2" x 3-1/2" A325 bolts, 1/2" A563-DH nuts and 1/2" F436 washers |
The quantity of what the sample constitutes | 87/87/174 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Craig | Last name of sampler or witnessed by | Hager |
Title of sampler | QA Inspector | Telephone number of sampler | 925-899-1184 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | UIS Lindon UT | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | B29-033-20 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM3 - Fastener Assembly | Rocap Number(s) | TT0131087 |
---|---|---|---|
Heat Number(s) | bolts - 20495460, nuts - 20650010, washers - 190394 | Nut Mfg. Lot Number(s) | L511Q1 |
Washer Mfg. Lot Number(s) | 957-190394 | Bolt Specification | A325 |
Bolt Length(s) | 3-1/2 in. | Nut Specification | A563-DH |
Washer Specification | F436 | Finish | HDG - all |
Diameter/Size | 1/2 in. | Bolt Mfg. Lot Number | G9825 |
Rocap Test Requirement(s) | Yes | Lubricant Requirements(s) | none |
Submitted Tests
Go to page:
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2020-08-03-4-1 ASTM F606-14a (Verified)
DIME Test ID: 2020-08-03-4-2 ASTM F606-14a (Verified)
DIME Test ID: 2020-08-03-4-3 ASME B1.2-83r01 (Verified)
DIME Test ID: 2020-08-03-4-4 ASME B1.2-83r01 (Verified)
DIME Test ID: 2020-08-03-4-5 ASME B1.2-83r01 (Verified)
DIME Test ID: 2020-08-03-4-6 ASME B1.2-83r01 (Verified)
DIME Test ID: 2020-08-03-4-7 ASME B1.2-83r01 (Verified)
DIME Test ID: 2020-08-03-4-8 ASME B1.2-83r01 (Verified)
DIME Test ID: 2020-08-03-4-9 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-10 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-11 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-12 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-13 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-14 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-15 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-16 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-17 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-18 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-19 ASTM B499-14 (Verified)
DIME Test ID: 2020-08-03-4-20 ASTM E18-15 (Verified)
DIME Test ID: 2020-08-03-4-21 ASTM E18-15 (Verified)
DIME Test ID: 2020-08-03-4-22 ASTM E18-15 (Verified)