Sample Record
Owner Lab
- Trinity Engineering Laboratories, Incorporated - Fresno
DIME Sample ID 2020-06-05-32
Project Information
Project Identifiers | Project ID: 214292 DEA: 060Q9004 EFIS: 0614000047 |
---|---|
DIST-CO-RTE-PM | 06-FRE-180-92.2,130.1 |
Award Date | 12/13/2019 |
Closeout Date | 10/29/2020 |
Work Description | REPLACE BRIDGE RAILS. |
Location Description | FRESNO COUNTY NEAR SQUAW VALLEY AT MILL CREEK BRIDGE AND NEAR BOYDEN CAVE AT SOUTH FORK KINGS RIVER BRIDGE |
QA Service Level | 1 (Verified on 08/05/2019) |
Sample Information
Sample Taken Date | 06/05/2020 | Sample Unique Key | 32 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/08/2020 |
Sample type | Quality Control | A brief description of the sample | PCC |
The quantity of what the sample constitutes | four cylinders | From where was the sample collected | Other |
First name of sampler or witnessed by | Matthew | Last name of sampler or witnessed by | Horn |
Title of sampler | QC Technician | Telephone number of sampler | 5593928776 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Outback Materials | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 72T1X10 |
---|---|---|---|
The truck number from where the sample was collected | 101 | The batch plant ticket number from where the sample was collected | 79209 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | Unknown | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2020-06-05-32-1 | ASTM C143-15a: Standard Test Method for Slump of Hydraulic-Cement Concrete | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 06/05/2020 | Christen Guilmette | No | Info | ||
2020-06-05-32-2 | CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 06/05/2020 | Christen Guilmette | No | Info | ||
2020-06-05-32-3 | CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 06/12/2020 | Christen Guilmette | No | Info | ||
2020-06-05-32-4 | CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 06/15/2020 | Christen Guilmette | No | Info | ||
2020-06-05-32-5 | CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders | Matthew Horn, Trinity Engineering Laboratories, Incorporated - Fresno | 07/03/2020 | Christen Guilmette | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2020-06-05-32-1 ASTM C143-15a
DIME Test ID: 2020-06-05-32-2 CTM 504-June 2010
DIME Test ID: 2020-06-05-32-3 CTM 521-June 2012
DIME Test ID: 2020-06-05-32-4 CTM 521-June 2012
DIME Test ID: 2020-06-05-32-5 CTM 521-June 2012