Sample Record

Owner Lab

  • CT D08 - Fontana Field Testing Laboratory

DIME Sample ID 2020-06-15-24

Project Information

Project IdentifiersProject ID: 214221
DEA: 081F1424
EFIS: 0815000232
DIST-CO-RTE-PM08-RIV-15-23.9/33.4
Award Date09/05/2019
Closeout Date03/01/2022
Work DescriptionREPLACE INDIVIDUAL PCC SLABS, GRIND PCC PAVEMENT AND UPGRADE GUARDRAIL
Location DescriptionRIVERSIDE COUNTY NEAR LAKE ELSINORE FROM NICHOLS ROAD OVERCROSSING TO 0.2 MILE NORTH OF TEMESCAL CANYON ROAD UNDERCROSSING
QA Service Level1 (Verified on 12/04/2019)

Sample Information

Sample Taken Date06/15/2020 Sample Unique Key24
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing06/16/2020
Sample typeQuality Assurance A brief description of the samplePCC Rapid set beams
The quantity of what the sample constitutes3 beams From where was the sample collectedJob Site
First name of sampler or witnessed byRMA QC Last name of sampler or witnessed byRMA QC
Title of sampler Telephone number of sampler
Laboratory sample identification6 ISR-A, 6 ISR-B, 6 ISR-C Linked DIME Sample ID
The fabricator/manufacturer/facility nameMSC Plant 1 Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number900-5HE
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedTT
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedconcrete sample from wheel barrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2020-06-15-24-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, D. Montemayor, CT D08 - Fontana Field Testing Laboratory06/18/2020kaushal talati
Yes
07/06/2020
2020-06-15-24-2CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, D. Montemayor, CT D08 - Fontana Field Testing Laboratory06/18/2020kaushal talati
Yes
07/06/2020
2020-06-15-24-3CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, D. Montemayor, CT D08 - Fontana Field Testing Laboratory06/18/2020kaushal talati
Yes
07/06/2020

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-06-15-24-1 CTM 524-March 2013 (Verified)
DIME Test ID: 2020-06-15-24-2 CTM 524-March 2013 (Verified)
DIME Test ID: 2020-06-15-24-3 CTM 524-March 2013 (Verified)