Sample Record

Owner Lab

  • CT QASI - Los Angeles Field Laboratory

DIME Sample ID 2020-03-26-1

Project Information

Project IdentifiersProject ID: 212324
DEA: 033F5104
EFIS: 0313000020
DIST-CO-RTE-PM03-YUB-20-R18.1/R20.1
Award Date10/31/2019
Closeout DateNot set
Work DescriptionConstruct bridge, realign curve & widen shoulders.
Location DescriptionConstruction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road.
QA Service Level1 (Verified on 02/27/2020)

Sample Information

Sample Taken Date03/26/2020 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing04/02/2020
Sample typeQuality Control A brief description of the sample#8 6'-8"Ø Welded Hoops
The quantity of what the sample constitutes(4) From where was the sample collectedFabricator
First name of sampler or witnessed byRigoberto Last name of sampler or witnessed byMarin
Title of samplerQAI Telephone number of sampler951-500-0685
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTNT Rebar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormL133-067-20 Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)464619
Hoop Manufacturer Lot Number(s)Lot 15 Material Standard CodeASTM A706
Material Grade60 Rebar Size8
Diameter of Hoop8'-6" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerCascade Steel
Welding CompanyTNT Rebar Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester NameTesting LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
No results found.