Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2019-11-15-43

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 213682
DEA: 11430184
EFIS: 1117000215
DIST-CO-RTE-PM11-SD-805-8.4/8.8
Award Date12/13/2018
Closeout Date09/14/2023
Work DescriptionBridge widening, HMA, barrier, drainage, RCP, and landscape work near Sweetwater River Bridge in Chula Vista. Widening of Sweetwater River Bridge in Chula Vista on 805.
Location DescriptionNear Sweetwater River Bridge in Chula Vista on 805.
QA Service Level1 (Verified on 06/01/2020)

Sample Information

Sample Taken Date11/15/2019 Sample Unique Key43
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/23/2019
Sample typeQuality Assurance A brief description of the sampleLenton Couplers
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byDoug Last name of sampler or witnessed byLe
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCascade Steel, Erico Transportation Laboratory (TL) NumberC958005
Inspector Lot Number from the Transportation Laboratory (TL) FormNA Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCascade Steel
Coupler ManufacturerErico Intermediate Assembler or FabricatorUnknown
Rebar Size11 Coupler ModelLenton A2
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)L9563 Rebar Heat Number(s)426117
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2019-11-15-43-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory12/24/2019bewing
Yes
12/24/2019Service Splice
2019-11-15-43-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory12/24/2019bewing
Yes
12/24/2019Service Splice
2019-11-15-43-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory12/24/2019bewing
Yes
12/24/2019Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-11-15-43-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-11-15-43-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-11-15-43-3 CTM 670-December 2013 (Verified)