Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2018-11-08-8

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date11/08/2018 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/09/2018
Sample typeQuality Control A brief description of the sample6x12 Cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byJavier Last name of sampler or witnessed bySolorio
Title of samplerQC Field Technician Telephone number of samplerUnknown
Laboratory sample identificationSet 4 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierUnknown
Structure nameUnknown

Material Information

Material TypeConcrete The concrete mix design numberG3-15-STR-006F
The truck number from where the sample was collectedLoad 80 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 4
A detailed description of where the material sample was collectedValley View Bridge Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2018-11-08-8-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersRon Hernandez, G3 Quality, Incorporated - Cerritos11/15/2018Nena Hernandez
Yes
02/22/2019
2018-11-08-8-2CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersRon Hernandez, G3 Quality, Incorporated - Cerritos12/06/2018Nena Hernandez
Yes
02/22/2019
2018-11-08-8-3CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement ConcreteJavier Solorio, G3 Quality, Incorporated - Cerritos11/08/2018Nena Hernandez
Yes
02/22/2019
2018-11-08-8-4CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteJavier Solorio, G3 Quality, Incorporated - Cerritos11/08/2018Nena Hernandez
Yes
02/22/2019
2018-11-08-8-5CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodJavier Solorio, G3 Quality, Incorporated - Cerritos11/08/2018Nena Hernandez
Yes
02/22/2019
2018-11-08-8-6CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement ConcreteJavier Solorio, G3 Quality, Incorporated - Cerritos11/08/2018Nena Hernandez
Yes
02/22/2019

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2018-11-08-8-1 CTM 521-November 2014 (Verified)
DIME Test ID: 2018-11-08-8-2 CTM 521-November 2014 (Verified)
DIME Test ID: 2018-11-08-8-3 CTM 557-July 2012 (Verified)
DIME Test ID: 2018-11-08-8-4 CTM 518-June 2010 (Verified)
DIME Test ID: 2018-11-08-8-5 CTM 504-June 2010 (Verified)
DIME Test ID: 2018-11-08-8-6 CTM 533-June 2010 (Verified)