Sample Record
Owner Lab
- CT - Unassigned/General Field Laboratory
DIME Sample ID 2018-11-28-3
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 213771 DEA: 081K3404 EFIS: 0819000023 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Repair Bridge |
Location Description | Washington Street OC |
QA Service Level | 1 (Verified on 11/21/2018) |
Sample Information
Sample Taken Date | 11/28/2018 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/04/2018 |
Sample type | Quality Assurance | A brief description of the sample | Bar Lock Couplers |
The quantity of what the sample constitutes | 8 each | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Gary | Last name of sampler or witnessed by | MaComb |
Title of sampler | ASI | Telephone number of sampler | 5624498001 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Field | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L10-071-18 | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Gerdau |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | Santiago Rodriguez |
Rebar Size | 6 | Coupler Model | Double Barrel Zap |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | straight | Rebar Hoop Fabricator | none |
Coupler Component Heat/Lot Number(s) | 5217 | Rebar Heat Number(s) | 65032646 |
Rebar Size 2 | 6 | Coupler Unique ID | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2018-11-28-3-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-11-28-3-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2018-11-28-3-3 CTM 670-December 2013 (Verified)