Sample Record
Owner Lab
- CT D05 - Whitley Gardens Field Laboratory
DIME Sample ID 2025-02-08-3
Project Information
Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
---|---|
DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
Award Date | 02/27/2023 |
Closeout Date | Not set |
Work Description | Wye Segment - Route 41/46 Separation |
Location Description | Not set |
QA Service Level | 1 (Verified on 12/16/2022) |
Sample Information
Sample Taken Date | 02/08/2025 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/11/2025 |
Sample type | Acceptance | A brief description of the sample | 3 HMA cores |
The quantity of what the sample constitutes | 750 tons | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Tristan | Last name of sampler or witnessed by | Netherton |
Title of sampler | SPM QC | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Papich Construction | Transportation Laboratory (TL) Number | 250218-L2SL35 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 2 |
Sublot number | 35 | HMA Mix Number | L230077A |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2025-02-08-3-1 AASHTO T209-22 (Verified)
DIME Test ID: 2025-02-08-3-2 AASHTO T275-07r12 (Verified)
DIME Test ID: 2025-02-08-3-3 AASHTO T275-07r12 (Verified)
DIME Test ID: 2025-02-08-3-4 AASHTO T275-07r12 (Verified)